Files
holocron/plugins/gitea/.apm/skills/gitea-releases/references/conventions.md
Defame1297 d2da45f78c fix(gitea-releases): restore the prerelease imperative to the create path
The retrofit left only a descriptive sentence on the loaded path — "Gitea
never infers a prerelease from a -beta/-rc tag name" — and moved the
imperative into references/conventions.md behind a trigger listing semver
naming, release-notes sourcing and release-to-tag relationships. Draft and
prerelease are not in that list, and "cut a v2.0.0-beta.1" is exactly the
request where the caller does not raise the topic, so the rule was
unreachable from the flow that needs it.

Severity comes from the repair path: the MCP surface has create, get,
get_latest, list and delete only — there is no update or edit tool. A
release published without is_pre_release can only be corrected by
delete_release plus a fresh create, and get_latest_release points
consumers at the beta meanwhile. Neither SKILL.md nor call-signatures.md
said so anywhere.

The flags are now set explicitly on every create, the missing update tool
and its delete-and-recreate consequence are stated in the body, and the
semver pass-through rule stranded behind the same trigger is promoted
alongside it. call-signatures.md now cites the deployed tool description
as direct evidence that get_latest_release excludes drafts, while keeping
the prerelease half hedged — that remains unconfirmed.

Verified live against gitea-mcp v1.7.0, read-only calls.

Refs #99
2026-08-30 20:51:22 +00:00

2.6 KiB

topic, source_keys
topic source_keys
conventions
context7-websites-gitea
context7-gitea-tea-cli

Release and tag conventions

Practitioner conventions that inform how to use the mechanics in call-signatures.md — not additional tool schemas.

Release wraps a tag, not the reverse

A release is a title, body (notes), and draft/prerelease flags layered on top of an existing or newly-created tag. The tag is the git-level object (a name pointing at a commit); the release is a Gitea-level metadata wrapper around it. This is why delete_release and delete_tag are separate calls with separate identifiers (numeric id vs. tag name) — removing the wrapper never implies removing the underlying pointer, and vice versa.

Semver tag naming

Per the tea CLI (the reference Gitea client), tag names conventionally follow semver with a v prefix: v1.2.0, v2.0.0-beta.1. This is a convention observed by tooling and humans, not a Gitea-enforced constraint — the API accepts any string as tag_name. Don't validate or rewrite a caller-supplied tag name against semver; just pass it through.

Draft and prerelease are explicit flags

is_draft and is_pre_release are booleans the caller sets directly on create_release — Gitea does not infer either from the tag name, even though the -beta/-rc suffix convention above is commonly used to signal a prerelease to humans. When a user asks to "cut a beta" or "publish a release candidate," set is_pre_release: true explicitly in the same call rather than relying on the tag string to carry that meaning.

Getting this wrong is not cheaply repairable. The gitea-mcp release surface is create_release, get_release, get_latest_release, list_releases and delete_release — there is no update or edit tool, so a published release's flags cannot be corrected in place. The only remedy is delete_release plus a fresh create_release, a destructive round trip; meanwhile a beta published without is_pre_release is the release get_latest_release returns. Set the flags in the create call.

Note the input/output naming mismatch: the input param is is_draft, but the release object returned by the API uses draft (and prerelease) as the field names. draft is never a valid input key — passing draft: true to create_release is silently ignored rather than erroring.

Release notes sourcing

Practitioner convention (per tea) is to source release notes (body) from a changelog file rather than typing them inline for each release — useful context when a caller asks to "generate" or "use the changelog for" release notes rather than write them from scratch.