feat(delivery): add the dry-run-gated role and allow several dry runs

A repo's CI checks may now list one or more dry-run checks and any
number of dry-run-gated ones: a dry run that posts its status only
after an allowlisted human adds a label. delivery-ci-checks classifies
a gated check with no status on the pinned SHA as awaiting-gate, which
passes the verdict, is never waited on, and is reported on its own
Awaiting gate line. qa never fails on it, the implement lead notes it
in the Handoff's Open questions, and the review records it as a
non-blocking finding for the approver. No agent sets the gate label.

Refs: #218

Co-Authored-By: Claude Opus 5.5 <[email protected]>
Claude-Session: https://claude.ai/code/session_014uGZTNugst7K9Bd2FTR4Mi
This commit is contained in:
Defame1297andClaude Opus 5.5 committed 2026-11-25 08:58:03 +00:00
1 parent d72afcd1bf
commit 6cb27a576d
11 files changed
+80 -47

No files matched your search

@@ -113,15 +113,17 @@ with blocking findings. On a PR, the issue is the one its body's `Closes #<n>` n
`## Acceptance checks` block and the skill names.
- `pass` → step 9.
- `fail` → back to step 7 with its findings. After the third `fail` this session → Stop with
"QA failed 3 rounds" and the last findings.
"QA failed 3 rounds" and the last findings. An `awaiting-gate` name is never a fail and never
counts toward this limit.
- `pending` → Stop with "CI still running".
- `stop` → Stop with its reason: a missing or malformed check is not the implementer's to fix.
9. Run `delivery-handoff` Step 5: one Handoff comment on the PR, Decisions and Rejected taken from
the role agents' reports and every step 6 and step 7 verdict, Evidence linking the PR, the
commits and the CI runs QA cited. Then remove the `WIP:` prefix from the PR title with
`gitea-prs`, which makes the PR eligible for the review stage. The comment goes first so a crash
between the two leaves a recorded hand-off on a PR still in `WIP:`, never a review-eligible PR
with no Handoff comment for the reviewer's Required inbound check.
commits and the CI runs QA cited, and Open questions one line "awaiting human gate: `<check>`"
per name on QA's last `awaiting-gate` line (else `none`). Then remove the `WIP:` prefix from
the PR title with `gitea-prs`, which makes the PR eligible for the review stage. The comment
goes first so a crash between the two leaves a recorded hand-off on a PR still in `WIP:`, never
a review-eligible PR with no Handoff comment for the reviewer's Required inbound check.
## Output