Merge pull request 'docs(plan): record skill wiring decisions for /plan' (#251) from docs/plan-skill-wiring into main
Reviewed-on: #251
This commit was merged in pull request #251.
This commit is contained in:
commit
0d99a41a57
3 files changed
+58
-13
No files matched your search
@@ -45,5 +45,6 @@ approved) are human-set tracker state. `mattpocock`'s thinking tools (`wayfinder
|
||||
`research-docs` moved there too. `setup-matt-pocock-skills` is pinned in both packages, at one
|
||||
upstream tag that is bumped in both together. `delivery` keeps its `mattpocock` dependency, but
|
||||
references none of the moved skills, so it does not depend on `plan`.*
|
||||
- *Amended 2026-11-29: bin's `write-docs` moves to `plan` too, alongside `research-docs`.*
|
||||
- Infra applies happen by merge (GitOps for Flux, Ansible and OpenTofu alike), so the PR gate is the
|
||||
apply gate; the operator verifies and opens revert PRs, never reverting on its own.
|
||||
@@ -28,6 +28,10 @@ How the `wayfinder` skill's map and tickets map onto Gitea, which has native iss
|
||||
- **Frontier query**: open issues in the map's milestone with no assignee, then drop any whose `get_blocked_by` lists an open issue.
|
||||
- **Research findings**: committed on a `research/<name>` branch that is pushed but never merged; the ticket's resolution comment links it.
|
||||
|
||||
## Spec milestones
|
||||
|
||||
On `/plan`'s spec-and-tickets track, `/plan` creates one milestone titled `Spec: <spec issue title>` and assigns every ticket filed from that spec to it. The milestone is created through `gitea-labels-milestones` and the assignment is made through `gitea-issues`. This sits beside the `Map: <name>` milestone above and follows the same one-milestone-per-parent shape. Spec tickets that carry acceptance criteria get `Status/Ready for Agent`; ones without do not.
|
||||
|
||||
## PRs as a request surface
|
||||
|
||||
Off. Only issues feed the triage queue; PRs are not triaged as requests.
|
||||
@@ -28,13 +28,18 @@ The goal is to optimise:
|
||||
|
||||
## Tracks
|
||||
|
||||
The work takes one of two tracks:
|
||||
The work takes one of three tracks:
|
||||
|
||||
- **Spec and tickets**: a spec issue in the tracker, broken down into tickets.
|
||||
- **Ticket(s) only**: one or more tickets with no spec.
|
||||
- **Wayfinder**: work too large for one agent session, or with decisions that cannot be settled
|
||||
yet.
|
||||
|
||||
The plugin recommends a track, with its reason, after the initial grilling (step 2). The user
|
||||
confirms it at agreement (step 6), because the plan can change the size of the work.
|
||||
The plugin recommends a track, with its reason, after the initial grilling (step 2). For the first
|
||||
two tracks the user confirms it at agreement (step 6), because the plan can change the size of the
|
||||
work. Wayfinder is different: it is confirmed right after step 2. `/plan` then gives the user a
|
||||
copyable `/wayfinder` command (hand-invoked) carrying the intent and the grilling answers, and
|
||||
stops. Steps 3-10 are skipped.
|
||||
|
||||
## Interaction flow
|
||||
|
||||
@@ -45,25 +50,38 @@ confirms it at agreement (step 6), because the plan can change the size of the w
|
||||
1. **Gate.** A cheap check before any grilling: is it a duplicate of an open issue or PR, is it
|
||||
already done, does it contradict an ADR, or is it outside the repo's scope (`docs/VISION.md`)?
|
||||
If any of these is true, stop.
|
||||
2. **Initial grilling**, only if required, to explore the ticket's or idea's intention. It ends
|
||||
with a recommended track.
|
||||
3. **Research** in the repo and online, scoped to the recommended track.
|
||||
2. **Initial grilling**, only if required, to explore the ticket's or idea's intention. It uses
|
||||
`grilling`, plus `domain-modeling` to challenge terms only. GLOSSARY.md and the ADRs are not
|
||||
edited during grilling: candidates are collected and written in step 7. This equals
|
||||
`grill-with-docs` minus the writing during grilling (`grill-me` and `grill-with-docs` are
|
||||
hand-invoked wrappers). It ends with a recommended track.
|
||||
3. **Research** in the repo and online, scoped to the recommended track. Researchers flag when
|
||||
lasting reference docs for an external tool or library are needed. Nothing is written in this
|
||||
step.
|
||||
4. **Deep validation.** Check that the work is feasible and fits the repo as it is now. If it does
|
||||
not, go back to grilling (step 2) or stop.
|
||||
5. **Offer a plan** with options, considerations, recommendations, impact, expected results and
|
||||
the track.
|
||||
the track. `codebase-design` is used only when the options change module or interface shape.
|
||||
The plan also lists the repo docs needed for downstream context.
|
||||
6. **Agreement.** The user agrees and confirms the track, or the flow goes back to grilling or
|
||||
research.
|
||||
7. **Record decisions.** Open a docs PR that updates AGENTS.md, GLOSSARY.md, the ADRs and any
|
||||
other relevant docs with what was decided. The spec links to it, so tickets point at decisions
|
||||
that are already written down rather than pending.
|
||||
that are already written down rather than pending. After `plan-recorder` opens the docs PR,
|
||||
`/plan` gives copyable `/write-docs` and `/research-docs` commands for the user to run on the
|
||||
docs branch and push to the same PR. `/plan` first asks the user for the `research-docs` output
|
||||
path. Both need the user in the loop, so they cannot run inside a subagent.
|
||||
8. **Write the spec** as an issue in the tracker (Gitea included). This step runs on the spec and
|
||||
tickets track only.
|
||||
9. **Propose a breakdown** into tickets. If the breakdown shows a gap in the spec, go back to
|
||||
step 8.
|
||||
10. **Approval and filing.** One explicit approval covers the whole batch. The plugin files the
|
||||
tickets and sets `Status/Ready for Agent` on the ones that carry acceptance criteria. A
|
||||
ticket without acceptance criteria is never set ready.
|
||||
ticket without acceptance criteria is never set ready. `gitea-labels-milestones` resolves the
|
||||
label IDs for the Ready-for-Agent strip. On the spec track it also creates the
|
||||
`Spec: <title>` milestone, and `gitea-issues` assigns the filed tickets to it.
|
||||
|
||||
Every hand-invoked command `/plan` asks the user to run is presented as a copyable code block.
|
||||
|
||||
### Loops
|
||||
|
||||
@@ -73,6 +91,8 @@ The flow is a loop, not a straight line. The named loop-backs are:
|
||||
- disagreement → grilling or research (step 6 back to 2 or 3);
|
||||
- breakdown → spec (step 9 back to 8).
|
||||
|
||||
Wayfinder is an early exit rather than a loop: it ends the flow after step 2.
|
||||
|
||||
After two loops on the same point, the plugin asks whether to park the idea instead of
|
||||
circling.
|
||||
|
||||
@@ -114,6 +134,11 @@ sequenceDiagram
|
||||
U-->>P: answers
|
||||
end
|
||||
P-->>U: recommended track + reason
|
||||
opt track = wayfinder (confirmed here, not at step 6)
|
||||
U->>P: confirm wayfinder
|
||||
P-->>U: copyable /wayfinder command (intent + grilling answers)
|
||||
Note over P,U: stop, steps 3-10 skipped
|
||||
end
|
||||
|
||||
par Research (step 3), scoped to track
|
||||
P->>R: practices, patterns, conventions
|
||||
@@ -136,6 +161,8 @@ sequenceDiagram
|
||||
|
||||
%% Step 7 — Record decisions
|
||||
P->>T: open docs PR (AGENTS.md, GLOSSARY, ADRs)
|
||||
P-->>U: copyable /write-docs and /research-docs commands
|
||||
U->>T: run on the docs branch, push to the same PR
|
||||
|
||||
%% Steps 8–9 — Spec and breakdown
|
||||
loop until breakdown shows no spec gap
|
||||
@@ -147,7 +174,10 @@ sequenceDiagram
|
||||
|
||||
%% Step 10 — Approval and filing
|
||||
U->>P: one approval for the whole batch
|
||||
P->>T: file tickets
|
||||
opt track = spec + tickets
|
||||
P->>T: create milestone "Spec: <title>"
|
||||
end
|
||||
P->>T: file tickets (assigned to the milestone on the spec track)
|
||||
P->>T: set Status/Ready for Agent<br/>(only tickets with acceptance criteria)
|
||||
P-->>U: links to spec, tickets, docs PR
|
||||
```
|
||||
@@ -170,9 +200,20 @@ sequenceDiagram
|
||||
read-only (the researcher may write only to the scratchpad), and `plan-recorder` (step 7, the docs PR).
|
||||
- `.apm/skills/plan-track/`: the track criteria.
|
||||
|
||||
All of these are minimal stubs, to be built out. The prompt and agents route to `gitea-issues`, `gitea-prs`,
|
||||
All of these are minimal stubs, to be built out. The prompt and agents route to `gitea-issues`, `gitea-labels-milestones`, `gitea-prs`,
|
||||
`git-commits` and `agentsmd-author`, which `plan` does not declare as dependencies: it assumes the
|
||||
`gitea`, `git` and `core` packages are installed.
|
||||
`gitea`, `git` and `core` packages are installed. `research-docs` lives in `plan`, and `write-docs`
|
||||
will too (see below).
|
||||
|
||||
### Agreed, not yet built
|
||||
|
||||
Agreed in the design above and ticketed separately; none of it is in the prompt yet:
|
||||
|
||||
- `write-docs` moves from `bin` to `plan` (`bin` 4.0.0 to 5.0.0, `plan` 0.4.0 to 0.5.0).
|
||||
- `plan-track` gains the third, `wayfinder` track.
|
||||
- `plan.prompt.md` is rewired: the wayfinder early exit, grilling with `domain-modeling`, the
|
||||
step-7 hand-run `/write-docs` and `/research-docs` commands, and the `Spec:` milestone with
|
||||
ticket assignment.
|
||||
|
||||
## Open for later
|
||||
|
||||
@@ -180,7 +221,6 @@ All of these are minimal stubs, to be built out. The prompt and agents route to
|
||||
human sets `Status/Ready for Agent`, while plan may set it (step 10). When the two meet, one
|
||||
of those rules has to change.
|
||||
- Templates for the spec and tickets. Plan will own them.
|
||||
- How epics are represented and tickets linked (milestones, map issues, dependency edges).
|
||||
- Where research output goes: folded into the spec, or kept as findings files.
|
||||
- Whether the tracker issue carries the session's state, so planning can be resumed across
|
||||
sessions.
|
||||
Reference in new issue
Block a user