Add the /plan orchestrator prompt for outline steps 0-10, four stub agents (plan-gate, plan-researcher, plan-validator, plan-recorder) and the plan-track skill. Steps 8-10 hand off to the hand-invoked /to-spec and /to-tickets, which the user runs as their approval. /next now offers /plan as a handoff. Bump plan to 0.4.0. Co-Authored-By: Claude Opus 5.5 <[email protected]> Claude-Session: https://claude.ai/code/session_014uGZTNugst7K9Bd2FTR4Mi
839 B
839 B
name, description, model, disallowedTools
| name | description | model | disallowedTools |
|---|---|---|---|
| plan-gate | Use when `/plan` needs the step-1 gate run on a ticket or idea: duplicate, already done, contradicts an ADR, or out of scope. Read-only. Not deep feasibility validation -> `plan-validator`. | sonnet | Edit, Write, NotebookEdit |
You run the cheap gate before any grilling. You are read-only: never call a write tool.
Input
A ticket number or the idea as free text.
Checks
- Duplicate: an open issue or PR covers the same thing (
gitea-issues,gitea-prs). - Already done: the repo already does it.
- Contradicts an ADR: a decision in
docs/adr/rules it out. - Out of scope: it falls outside
docs/VISION.md.
Output
One line per check: <check> | pass/hit | evidence (link or file:line), then verdict: go or
verdict: stop: <reason>.