docs: update a branch from main only when it is next to merge

main blocks an outdated branch, so every update re-runs Lint, Build
and Molecule and cancels the run in progress. Limit updates to the
pull request that is next to merge, schedule its merge afterwards,
and leave renovate/ branches to Renovate's own rebase.

Assisted-by: Claude Code:claude-opus-5-5
This commit is contained in:
Defame1297 committed 2026-11-27 13:37:49 +00:00
1 parent 6e3ea4521b
commit 3d2fab5388
1 file changed
+10 -1
+10 -1
View File
@@ -15,10 +15,19 @@ trailers, are in [ai-assistance.md](ai-assistance.md).
*Reason:* every change reaches `main` through the Lint and Build checks and a reviewer.
*Held by:* control: branch protection on `main`.
- **Do not push to someone else's branch or to a bot's branch; put your change in a pull request of
your own.** Updating a branch from `main` with Gitea's update button is allowed.
your own.** Updating a branch from `main` with Gitea's update button is allowed under the next
rule.
*Reason:* a push changes a head its author already reviewed or scheduled to merge, and a hand-made
commit on a `renovate/` branch makes Renovate stop rebasing it.
*Held by:* aspirational.
- **Update a pull request's branch from `main` only when it is next to merge: reviewed, green on its
previous head, and the only branch being updated. After updating your own pull request, give it a
scheduled merge; merge anyone else's as [reviewing.md](reviewing.md) says. Never update a
`renovate/` branch: Renovate rebases its branches that fall behind `main` at its next run.**
*Reason:* `main` blocks an outdated branch, so every update re-runs Lint, Build and Molecule, and
a new head cancels the run in progress; an update made while another pull request merges first is
wasted.
*Held by:* aspirational.
- **File an issue or open a pull request with the headings of the matching template in `.gitea/`,
also when you file through the API, `tea` or an MCP server.**
*Reason:* those routes skip the templates, and an agent's built-in body leaves out what review needs.